• About Us
    • Corporate Profile
    • Our Leadership
    • Awards
    • Licenses
  • Our Expertise
    • Underground Space
    • Geotechnical Works
    • Geotechnical
      3D Modelling
    • QECP & ABC Water Professional Services
    • Infrastructure Works
    • High Rise Building & Facade
    • Special Structures
    • Periodic Structural
      Inspection (PSI)
    • Periodic Façade Inspection (PFI)
    • Viaduct MRT
  • Our Projects
    • Woodlands Health Campus
    • The Linq Project
    • Slope Stability Assessment at The Rail Mall
    • NTU Slope Stabilization Works
    • T203 Woodlands
    • T219 Orchard Station
    • T221 Havelock Station
    • T213 Caldecott Station
    • C933 Bendemeer Station
    • LTA DE139 Earthworks at Lim Chu Kang Area
    • PUB Improvement of Sungei Pandan Kechil
    • PUB Bukit Timah First Diversion Canal
    • PUB Improvement of Sungei Tampines
    • PUB Improvement of Sungei Selarang
    • JTC Jurong Island Westward Extension
    • JTC Tuas Terminal Phase 1
    • JTC Ayer Merbau
    • JTC Pasir Ris Water Fabrication Park
    • HDB West Hill at Bukit Batok
    • HDB Land Reclamation at Changi East
    • HDB Construction of Polders at Pulau Tekong
    • Clementi N4C11 Project
    • Clementi N4C12 Project
    • Clementi N2C3 Project
    • Kallang Whampoa C55 Project
    • Bishan East Contract C35A/C35B Project
    • T3008
    • Dawson C5 Project
    • Dawson C7 Project
    • Geo-barrier System Proposed A&A to the Existing National Orchid Garden
    • Geo-barrier System Proposed Coastal Protection at Changi Beach Park
    • Contract NS2
    • TE02 Lim Chu Kang
    • J111
    • Benoi Gul
    • Selarang
    • Tekong Polder
    • Coastal Protection
    • Infrastructure Work At Lim Chu Kang
    • Tunneling And Pipe Jacking For Water Pipe Project At River Valley Area
    • Improvement To Sungei Tampines
    • Marina East Design Desalination Plant
    • T235 – Rail Transit System (RTS) from Woodlands to Johor Bahru
    • Large Diameter Water Pipelines At Ang Mo Kio Area
    • Slope Stabilisation Works Between Nanyang View And North Hill
    • LTA Covered Linkway Project
    • Mumbai Metro Contract UGC07
    • Widening Of Tampines Road Between Kallang Paya Lebar Expressway (KPE) And Tampines Avenue 10
    • Underground Package for KL Light Rail Transit Line 3 (KL – LRT3) from Bandar Utama to Johan Setia
    • Reclamation At East Side Of Singapore
    • Large Scale Floating Solar Test Bed At Tengah Reservoir
    • Underground Substation At Labrador Area
    • North-South Transmission Cable Tunnel (NS2) Cable Tunnelling
    • Caldecott MRT Station And Tunnels For Thomson Line
    • Active Beautiful And Clean (ABC Water Project) At Various Location
    • KL Skyworld – Awani 1
    • KL Skyworld – Awani 2
    • KL Skyworld –
      Sky Meridian
    • KL Skyworld –
      Bennington
  • Publication
  • Associate & Partner Company
  • Services
  • Contact US
Search
My Account
Cart 0
My Account
Cart0
Shop

Shop

  • Home
  • Shop
REACH US
  • 21, Bukit Batok Crescent #06-75 & #06-76 WCEGA Tower, Singapore 658065

  • (65) 6265 6766

  • (65) 6281 7151

  • admin@onesmart.com.sg

EXPLORE
  • Home
  • Publication
  • About Us
  • Associate & Partner Company
  • Our Expertise
  • Services
  • Our Projects
HELPFUL LINKS
  • Contact Us
  • Terms & Conditions
  • Privacy Policy
  • Coastal Protection
Copyright © ONE SMART Engineering Pte Ltd. All Rights Reserved. Web Excellence by Verz
Payment Method