Underground Substation At Labrador Area
Geotechnical Professional Engineer for Contractor for Diaphragm Wall Joint Grouting and Other Temporary Works – design of grouting and advice of sequential grouting method at DW joints for preventing water leakage through DW joints.
Got Any Questions? We’re Here To Help.
If you have any enquiry, please do not hesitate to contact us. Leave us a message and we will get back to you shortly.