Infrastructure Works
Marina East Desalination Plant
Floating PV Test-Bed at Tengah Reservoir (Phase 1)
Planning, Preliminary Design, Tender Design and Construction Stage Supervision for PublicUtility Board (PUB) & Solar Energy Research Institute Singapore
(DRAINAGE, SEWERAGE AND WATER PIPE)
- Improvement to Tanglin Halt Outlet Drain Contract
Qualified Person (Civil and Geotechnical) for all temporary excavation works (ERSS / GBW) and alternative design for the conversion of original box drain to new scheme of box drain with diaphragm wall - Improvement to Alexandra Canal Subsidiary Drain “F” (Between Tiong Bahru Road and Havelock Road)
Qualified Person (Civil and Geotechnical) for all temporary excavation works (ERSS / GBW), temporary sewer diversions, alternative proposal to replace jack-in piles and culvert crossing TSL tunnel to bored piles and alternative proposal to change jack-in piles to soil replacement to all U- drains - Improvement to Bukit Timah Canal near Maple Avenue
Design of temporary earth retaining structures, services steel bridges and flood gate, and QECP services - Improvement to Sungei Pandan Kechil (West Coast Road to the Sea)
Qualified Person (Civil and Geotechnical) for design of temporary earth retaining structures and flood gate, and QECP services
- Contract T2145: Sewer Diversion Works (Package D)
Qualified Person for Earth Retaining Stabilizing Structure (ERSS) - Proposed Sewers in Bedok Reservoir and Changi Business Park Areas
Design of sewer pipe jacking, temporary caissons and earth retaining structures - ER296 – Construction and Completion of Sentosa Gateway Tunnel from Telok Blangah Road to Keppel Road / Kampong Bahru Road / Lower Delta Road and Associated Road Widening Work along Lower Delta Road
Qualified Person for Earth Retaining Stabilizing Structure (ERSS) - Sewer Extension to Serve North Coast Area – Contract 3
Design of sewer pipe jacking, temporary caissons and earth retaining structures - Proposed Sewers in International Road Area
Qualified Person for Earth Retaining Stabilizing Structure (ERSS) - Proposed Sewers in Marina Central Area – Contract 1
Design of sewer pipe jacking, temporary caissons and earth retaining structures - Supply, Laying and Installation of 1200mm Diameter Potable Water Pipeline along Woodleigh Lane and Proposed New Upper Aljunied Road to Joo Seng Road
Design of jacking/receiving shaft and earth retaining structures - Construction of Roads, Drains, Sewers and Ancillary Works at Seletar Aero Drive
Design of sewer pipe jacking, temporary caissons and earth retaining structures - Roads and Infrastructure Works at Tampines N6 C1A/1B
Qualified Person for Excavation Works for the Permanent Slope with Height of more than 6m - Contract ER458 – Widening of Tanah Merah Coast Road
Structural Capacity check and hydraulic calculation - Proposed Sewers along Thomson-East Coastline and North-South Expressway Contract 2
Qualified person for Earth Retaining Stabilizing Structure (ERSS), design of pipe jacking works, Qualified Erosion Control Professional (QECP) Services - Proposed Minor Sewer / Sewer Abandonment and Diversion at Nim Road / Ang Mo Kio Avenue 5 (Serangoon North Planning Area)
Qualified person for Earth Retaining Stabilizing Structure (ERSS), design of pipe jacking works - Proposed Additions and Alterations to existing Renewable Diesel Plant involving New Erection of Process Plant and Associated Ancillary Facilities (Neste Growth Project) at 01 Tuas South Lane, Tuas South Lane, Tuas South Avenue 10 (Tuas Planning Area)
Qualified person for Earth Retaining Stabilizing Structure (ERSS) for 5 nos of tanks, with 3 designs for 3 zones based on nearest boreholes ground conditions - Construction of Road 1 & Road 2 at Hougang Town (N1), Widening of Hougang Ave 3 and Construction of Bus Shelter B07 at Hougang Ave 3
Qualified person for Earth Retaining Stabilizing Structure (ERSS) for drainage project - Improvement to Bayshore Park Outlet Drain
Design of temporary earth retaining structures, outfall structure, QECP services - Proposed 1200mm Diameter Potable Water Pipeline along Holland Road and Ulu Pandan Road from Rail Corridor (Murnane Pipeline) to Clementi Road
Design of temporary earth retaining structures, permanent work such as pipe jacking works, QECP services - Bidadari Phase 2g (A) Construction of Sang Nila Utama Road (B) Construction of Mount Vernon Lane (C) Expunction of Vernon Park & Mount Vernon Road (Part) (D) Earthworks off Bidadari Park Drive / Bartley Walk / Sang Nila Utama Road (E) Installation of Haunching, Pipe Sleeve & RC Maintenance Chambers to Pneumatic Waste Conveyance System (‘Pwcs’) Pipeline (F) Construction of Sewer at Sang Nila Utama Road
Design of Permanent Water Main Diversion, Water Pipeline Service S Protection for Concrete Haunching, Steel Pipe Sleeves and Construction of RC Maintenance Chamber, Design for Permanent Bus Shelter, Qualified Person for Earth Retaining Stabilizing Structure (ERSS) for Sewerage Work, Roadside Drain, QECP Services - Proposed 1600mm Diameter Water Pipeline Along PasirRis Drive 3 From Elias Road to Loyang Way
Permanent Design for Jacking Pipe 3000mm Diameter and 1600mm Diameter Composite Pipe, Qualified Person for Earth Retaining Stabilizing Structure (ERSS), design of pipe jacking works, QECP Services - Proposed Sewers in Changi East Area (Schedule I) Contract 2
Qualified person for Earth Retaining Stabilizing Structure (ERSS), design of pipe jacking works,QECP services - Supply, Delivery, Installation, Testing and Commissioning of Standby Diesel Generators at Lower Seletar Waterworks
Qualified person for Earth Retaining Stabilizing Structure (ERSS), QECP services - Proposed Twin 1800mm & 2200mm Dia Water Pipelines along AMK Ave 1 From UPP Thomson Road to Bishan Road
Qualified person for Earth Retaining Stabilizing Structure (ERSS),design of pipe jacking works, QECP services - De160 – Enhancement to Loyang Avenue between Tampines Expressway and PasirRis Drive 3
Permanent Design for Bus Shelter, Pedestrian Waiting Area, Lift Shaft Design & Staircase, Linkway with Trellis, Permanent Drain, Duct Bank, Qualified Person for Earth Retaining Stabilizing Structure (ERSS), QECP Services - Building & Infrastructure Work at Queenstown
Qualified person for Earth Retaining Stabilizing Structure (ERSS), QECP services - Project Te02 – Construction of Drains, Sewers, Water Pipelines and Ancillary Works at Lim Chu Kang
Qualified Person for Earth Retaining Stabilizing Structure (ERSS) for Diaphragm Wall, Sewerage, Waterpipe Work& Drainage Work, design of pipe jacking works, QECP Services - Proposed Sewer in Marina South Sub – Zone (Contract 2)
Qualified person for Earth Retaining Stabilizing Structure (ERSS), design of pipe jacking works - Improvement to SungeiSelarang and SungeiSelarang Subsidiary Drain A
Qualified Person for Earth Retaining Stabilizing Structure (ERSS) for Drainage Project, QECP Services - Changi East C06B (for ERSS Works JFS only)
Qualified person for Earth Retaining Stabilizing Structure (ERSS) for JFS & Open Cut Valve Pits and Pipeline Laying - Infrastructure Works at Alexandra (Phase A)
Qualified Person for Earth Retaining Stabilizing Structure (ERSS), QECP services - Proposed Erection of Integrated Waste Management Facility (IWMF) and Ancillary Buildings at 07 off Tuas South Lane / Tuas South Avenue 9 (EPC Package 2)
Qualified person for Earth Retaining Stabilizing Structure (ERSS), design of pipe jacking works - Bidadari Phase 2g (A) Construction of Sang Nila Utama Road (B) Construction of Mount Vernon Lane (C) Expunction of Vernon Park & Mount Vernon Road (Part) (D) Earthworks Off Bidadari Park Drive / Bartley Walk / Sang Nila Utama Road (E) Installation of Haunching, Pipe Sleeve & RC Maintenance Chambers to Pneumatic Waste Conveyance System (‘Pwcs’) Pipeline (F) Construction of Sewer at Sang Nila Utama Road
Design of permanent water main diversion, water pipeline service s protection for concrete hauching, steel pipe sleeves and construction of RC maintenance chamber, design for permanent bus shelter, Qualified person for Earth Retaining Stabilizing Structure (ERSS) for sewerage work, roadside drain, QECP services - Proposed 1600mm Diameter Water Pipeline Along PasirRis Drive 3 from Elias Road to Loyang Way
Permanent design for jacking pipe 3000mm diameter and 1600mm diamenter composite pipe, Qualified person for Earth Retaining Stabilizing Structure (ERSS), QECP services - Proposed Sewers in Changi East Area (Schedule II) – Contract 3
PE review of permanent DSM as foundation system (Capacity and settlement) using 3D finite element analysis for MH and sewer, (QECP) Services - Proposed Sewers in Changi East Area (Schedule I) Contract 2
Qualified person for Earth Retaining Stabilizing Structure (ERSS), QECP services - Supply, Delivery, Installation, Testing and Commissioning of Standby Diesel Generators at Lower Seletar Waterworks
Qualified person for Earth Retaining Stabilizing Structure (ERSS), QECP services - Proposed Twin 1800mm & 2200mm Dia Water Pipelines along AMK Ave 1 From UPP Thomson Road to Bishan Road
Qualified person for Earth Retaining Stabilizing Structure (ERSS), QECP services - Proposed Sewer in Marina South Sub – Zone (Contract 2)
Qualified person for Earth Retaining Stabilizing Structure (ERSS), QECP services - Infrastructure Works at Alexandra (Phase A)
Qualified person for Earth Retaining Stabilizing Structure (ERSS), QECP services
Got Any Questions? We’re Here To Help.
If you have any enquiry, please do not hesitate to contact us. Leave us a message and we will get back to you shortly.